
Waterscape Stoppages
Gainsborough Railway Bridge 35, River Trent
2013-05-08 00:00:00 -- 2013-05-10 23:59:59. Contractors will be inspecting the railway bridge, requiring the use of divers (within the navigable channel) to inspect the piers below water level.
Between Centenary Bridge and Bridge End (Calls Wharf)
2013-05-08 00:00:00 -- 2013-05-08 23:59:59. Diving contractors are undertaking a wall survey at the above site between 08.
Shepley Bridge Lock
2013-04-29 00:00:00 -- ongoing. UPDATE (03 May 2013): The lock gates are being removed on the 8th May and taken to Stanley Ferry Workshop so they can commence making replica gates.
Worksop - Bridge 42 Bridge Street Bridge to Bridge 41A, Sandy Lane Bridge
2013-04-15 00:00:00 -- 2013-05-10 23:59:59. UPDATE (03 May 2013): Land & Water working on behalf of the Canal & River Trust have been undertaking a scheme of towpath regeneration works.
River Severn
2013-05-02 00:00:00 -- ongoing. Please be advised that a landslip has occurred approximately 300 yards upstream from Bevere Lock on the River Severn.
Doncaster Lock
2013-05-03 00:00:00 -- 2013-05-03 23:59:59. Diving contractors will be on site to repair a damaged sluice stalk between 08.
Torksey Cut
2013-05-01 00:00:00 -- ongoing. The flood events over the last 12 months have caused a build-up of silt at several locations along the River Trent.
Rail Bridge 1C
2013-05-04 00:00:00 -- 2013-05-17 23:59:59. Contractors will be carrying out a survey of the rail bridge structure, which will necessitate the prior removal of pigeon guano.
Bridge 83, Keadby rail drawbridge
2013-04-30 00:00:00 -- 2013-06-09 23:59:59. Please slow down on the approach to the bridge and be prepared to stop if instructed.
Winkwell Swing Bridge
2013-05-02 00:00:00 -- 2013-05-03 23:59:59. UPDATE (30 April 2013): Modifications to Winkwell Swing Bridge will be carried out on Thursday 2nd May and Friday 3rd May.
Erewash Canal and Great Northern Basin at Langley
2013-05-19 00:00:00 -- 2013-06-01 23:59:59. UPDATE (30 April 2013): Over the Spring Bank Holiday weekend, May 24th,to May 27th, the Erewash Canal Preservation & Development Association will be holding its Forty-fifth Anniversary Rally.
Bridge 2A (Reeds Bridge)
2013-04-29 00:00:00 -- ongoing. The navigation and towpath are closed by bridge 2A due to unsafe structure.
Sykehouse Lock, Sykehouse Road Bridge, Kirk Lane Bridge
2013-05-03 00:00:00 -- 2013-05-03 23:59:59. P.